ZHENFA 100 MW Solar Power, Layyah
Geotechnical Investigation: Geoengineers conducted drilling of 44 No. of boreholes with HQ & NQ Diameter with total drilling of upto 408m, ERS survey, permeability tests…
Geotechnical Investigation: Geoengineers conducted drilling of 44 No. of boreholes with HQ & NQ Diameter with total drilling of upto 408m, ERS survey, permeability tests…
Feasibility Stage: Geoengineers conducted drilling of 18 No. of boreholes with HQ & NQ Diameter with total drilling of upto 1705m, ERS survey and permeability…
Feasibility Stage: Geoengineers conducted drilling of 6 No. of boreholes with HQ & NQ Diameter with total drilling of upto 103m, ERS survey and permeability…
Feasibility Stage: Geoengineers conducted drilling of 17 No. of boreholes with HQ & NQ Diameter with total drilling of upto 1812m, seismic survey of 60646m…
Geoengineers conducted consolidation grouting to increase water passing capacity of Panjnand Barrage.
Drilling and Consolidation grouting at Sust Section, Karakoram Highway for rehabilitation and road improvement with DTH drilling and Electrical Colloidal Grout Mixer.
Geoengineers drilled 22 No. of boreholes with HQ Diameter with total drilling of upto 1834m, seismic survey of 1560m length, and 69 no. of permeability…
Geoengineers conducted Curtain Drilling & Curtain Grouting Works at Basol Dam Ormara. Approximately total 4000m were drilled and grouted upto 2022.