Diamer-Bhasha dam Upon completion, would produce 4500 megawatts of electricity through hydro-power generation; store an extra 10.5 cubic kilometres of water for Pakistan that would be used for irrigation and drinking; extend the life of Tarbela Dam located downstream by 35 years; and control flood damage by the River Indus downstream during high floods.
Number of Boreholes: 5
Diameter: HQ Standard Size
Total Drilling: 167m
In-Situ Tests: Water Pressure Tests
Geotechnical Investigation of Permanent Bridge: Geoengineers conducted geotechnical investigation for permanent bridge over river indus for Diamer-Bhasha Dam. Total 5 boreholes were drilled with water pressure tests.