Mirpir-Mangla-Muzaffarabad-Mansehra Expressway (MMMM) The project constructing a 4-lane divided controlled access Expressway connecting Shinkiari – Muzaffarabad with GT road through Mangla, Mirpur. For Initial 35 km, the project would run parallel to the existing Kohalla-Muzaffarabad road along river Jehlum. From then onwards the expressway would continue on the left bank of the river till Mangla and after connecting Mirpur terminates at GT road near Dina.
Stage: Feasibility Study
Boreholes: 22 No’s
Total Drilling: 1834m
Seismic Refraction Survey: 1560m
Electrical Resistivity Tomography: 1200m
In-Situ Tests: Water Pressure & Permeability Test
Geotechnical Investigation & Geophysical Survey: Geoengineers drilled 22No’s of boreholes of total drilling upto 1834m. Seismic Refraction Survey and Electrical Resistivity Tomography was also done for geotechnical investigation of the project.