Azad Pattan Hydropower Project is a 700 MW hydroelectric power station on the Jhelum River roughly 7 km upstream of Azad Pattan Bridge in the Sudhanoti District, Azad Jammu and Kashmir, Pakistan and 90 km from Islamabad, the capital city of Pakistan.
Number of Boreholes: 18 No’s
Diameter: HQ & NQ Standard Size with Triple Tube
Total Drilling: 1705m
Seismic Refraction Survey & ERS: 3120m
Topographic Survey & Geological Mapping: Dam Site & Reservoir Area, Dam Tunnel, Tail Race Tunnel and Diversion Tunnel
In-Situ Tests: Water Pressure Tests
Consultants: SCOTT WILSON LTD, FHC CONSULTING ENGINEER
Feasibility Stage: Geoengineers conducted drilling of 18 No. of boreholes with HQ & NQ Diameter with total drilling of upto 1705m, ERS survey and permeability tests. Topographic survey and Geological mapping of Power House, Dam Site & Reservoir Area, Dam Tunnel, Tail Race Tunnel and Diversion Tunnel was also executed.