300MW Coal Power Project, Gawadar aims at improving the reliability of local power supply, which would help gradually solve the problems in current economic development and urban construction in the Gwadar region, which are being restricted by the shortage of power.
Number of Boreholes: 32
Diameter: HQ Standard Size
Total Drilling: 500+m
Geotechnical Investigation: Geoengineers executed drilling for detailed Geotechnical Investigation of 300MW Coal Power Project Gawadar.